Installing sql 2005 server cluster




















Now at the end, I'm having a new issue "Task schedule unable to run on node2". I saw the installation task was created on the secondary node scheduler with the same admin credential I'm using on the primary.

I also login and logoff with all related acccounts for profiles creation. I was trying to use the same account for the Task Scheduler Service instead of Local System as a work around but it did not work. Sign in. United States English. Ask a question. Quick access. Search related threads. Remove From My Forums. Answered by:. Archived Forums.

Getting started with SQL Server. Beginners just getting started - here's the place for help with simple questions. For installation or setup questions, refer to the Setup Forum. Sign in to vote. Hi there: From the MS cluster I'm able to see both node, do switching etc with not problem. I went over the cluster and SQL installation step by step, but still not clue Any help is appreciate it Thanks lmpbas.

Wednesday, September 19, PM. Mike, You will note that Hilary and I only used the terms "Active" and "Passive" to describe the current state of a cluster node in certain configurations. Geoff N. Thursday, October 4, PM. McGehee 0. That's not much information to go on.

Thursday, October 4, AM. Monday, October 8, PM. Yes DTC is configured Thanks. Tuesday, October 9, PM. Wednesday, October 10, AM. I'll try unistalling the SQL on node one Thanks for the reply. I am having the same issue during setup with the "unknown" nodes option being displayed while trying to attempt a 2-node sql server cluster installation. Basically, I am not able to include the other node in the installation as it sees it as unavailable.

Here is some initial info on the configuration: Win2K3 Ent. Edition Clustering was configured with Cluster Admin setup wizard successfully I've tested failing over groups and resources between both nodes without issues. Looked through some sql server setup logs and have found some errors which seem to relate to the unknown node issue MSI c 44! Its new value: 'Doing Action: WizardNext'.

Its current value is 'Doing Action: WizardNext'. Its current value is 'ClusterGroupDlg'. Its new value: 'ClusterNodeDlg'. The base drive, the one with the drive letter, cannot be shared among failover cluster instances. This is a normal restriction for failover clusters, but is not a restriction on stand-alone, multi-instance servers. The clustered installations of SQL Server are limited to the number of available drive letters. Assuming that you use only one drive letter for the operating system, and all other drive letters are available as normal cluster drives or cluster drives hosting mount points, you are limited to a maximum of 25 instances of SQL Server per failover cluster.

The 25 instance limit can be overcome by using SMB file share option. Ensure that the path specified for the tempdb data and log files is valid on all the cluster nodes. During failover, if the tempdb directories are not available on the failover target node, the SQL Server resource will fail to come online. For more information about proper quorum drive configuration, see Quorum Drive Configuration Information. To install a SQL Server failover cluster when the SQL Server source installation files and the cluster exist on different domains, copy the installation files to the current domain available to the SQL Server failover cluster.

For example, if you have a two-node cluster, with nodes named "Test1. Then you can select the Force protocol encryption check box on the SQL Server Configuration Manager to configure your failover cluster for encryption.

Do not select the Force protocol encryption check box until you have certificates installed on all participating nodes in your failover cluster instance.

For SQL Server installations in side-by-side configurations with previous versions, SQL Server services must use accounts found only in the global domains group. Additionally, accounts used by SQL Server services must not appear in the local Administrators group. Failure to comply with this guideline will result in unexpected security behavior. To create a failover cluster, you must be a local administrator with permissions to log on as a service, and to act as part of the operating system on all nodes of the failover cluster instance.

Domain groups must be within the same domain as the machine accounts. The following configurations are not supported :. If you want to create a file share resource, use a different, unique network name and IP address for the resource. We recommend that you do not use file shares on data drives, because they can affect SQL Server behavior and performance. Failover cluster Setup operations include a rule that checks network binding order. Although binding orders might seem correct, you might have disabled or "ghosted" NIC configurations on the system.

To avoid this situation, use the following steps to identify and remove disabled network adapters:. Expand the list of network adapters. Only the physical adapters should be in the list. If you have a disabled network adapter, Setup will report a failure for the network binding order rule.

Confirm that Network Settings in Control Panel shows the same list of enabled physical adapters that devmgmt. After Setup finishes, return to Network Connections in Control Panel and disable any network adapters that are not currently in use. Make sure that your operating system is installed properly and is designed to support failover clustering.

The following table is a list of SQL Server editions and the operating systems that support them. For those the only upgrade option is to install the new version side by side and migrate. The sections below describe the requirements to keep in mind when installing a SQL Server multi-subnet failover cluster.

A multi-subnet configuration involves clustering across multiple subnets, therefore involves using multiple IP addresses and changes to IP address resource dependencies. To create a SQL Server multi-subnet failover cluster, you must first create the Windows Server R2 multi-site failover cluster on multiple subnets. SQL Server failover cluster depends on the Windows Server failover cluster to make sure that the IP dependency conditions are valid if there is a failover.

Work flow for the rest of this topic depends on the features that you have specified for your installation. You might not see all the pages, depending on your selections Database Engine, Analysis Services, and Reporting Services. The actual services that are configured on this page depend on the features that you selected to install. You can assign the same login account to all SQL Server services, or you can configure each service account individually.

The startup type is set to manual for all cluster-aware services, including full-text search and SQL Server Agent, and cannot be changed during installation.

Microsoft recommends that you configure service accounts individually to provide least privileges for each service, where SQL Server services are granted the minimum permissions they have to have complete their tasks. To specify the same logon account for all service accounts in this instance of SQL Server, provide credentials in the fields at the bottom of the page.

To add or remove accounts from the list of system administrators, select Add or Remove , and then edit the list of users, groups, or computers that will have administrator privileges for the instance of SQL Server.

When you are finished editing the list, Click OK.. Verify the list of administrators in the configuration dialog box. When the list is complete, select Next. Use the Database Engine Configuration - Data Directories page to specify nondefault installation directories.

To install to default directories, select Next. If you specify nondefault installation directories, make sure that the installation folders are unique to this instance of SQL Server. None of the directories in this dialog box should be shared with directories from other instances of SQL Server. The data directories should be located on the shared cluster disk for the failover cluster instance. Use the Analysis Services Configuration - Account Provisioning page to specify users or accounts that will have administrator permissions for Analysis Services.

You must specify at least one system administrator for Analysis Services. To add or remove accounts from the list of system administrators, select Add or Remove , and then edit the list of users, groups, or computers that will have administrator privileges for Analysis Services.

Use the Analysis Services Configuration - Data Directories page to specify nondefault installation directories. Use the Reporting Services Configuration page to specify the kind of Reporting Services installation to create. For failover cluster instance installations, the option is set to Unconfigured Reporting Services installation. You must configure Reporting Services services after you complete the installation. The System Configuration Checker runs one more set of rules to validate your configuration with the SQL Server features that you have specified.

The Ready to Install page displays a tree view of installation options that were specified during Setup. To continue, select Install. Setup will first install the required prerequisites for the selected features followed by the feature installation. During installation, the Installation Progress page provides status so that you can monitor installation progress as Setup continues. After installation, the Complete page provides a link to the summary log file for the installation and other important notes.

If you are instructed to restart the computer, do so now. It is important to read the message from the Installation Wizard when you have finished with Setup. To add nodes to the single-node failover you just created, run Setup on each additional node and follow the steps for AddNode operation.

If you are adding more than one node, you can use the configuration file to deploy the installations. When you add a new node to an existing SQL Server failover cluster instance, make sure that you specify that the edition matches the edition of the existing failover cluster instance.

You may be asked to install the prerequisites, if they are not previously installed. Windows Installer 4. To prepare the node for clustering, move to the Advanced page and then select Advanced cluster preparation.

On the Language Selection page, you can specify the language for your instance of SQL Server if you are installing on a localized operating system and the installation media includes language packs for both English and the language corresponding to the operating system. You must specify the same product key on all the nodes that you are preparing for the same failover cluster instance.

Typical stand-alone instances of SQL Server, whether default or named instances, do not use a nondefault value for the Instance ID text box. The Disk Space Requirements page calculates the required disk space for the features that you specify, and compares requirements to the available disk space on the computer where Setup is running.

You might not see all the pages, depending on your selections. By default, options for error reporting is enabled. Repeat the previous steps to prepare the other nodes for the failover cluster instance. You can also use the autogenerated configuration file to run prepare on the other nodes. After preparing all the nodes as described in the prepare step , run Setup on one of the prepared nodes, preferably the one that owns the shared disk.

Use the Cluster node configuration page to select the instance name prepared for clustering, and specify the network name for the new SQL Server failover cluster instance.

Use the Cluster Resource Group page to specify the cluster resource group name where SQL Server virtual server resources will be located. To specify the SQL Server cluster resource group name.